PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Setting Rebar mats at Elev. 4  2nd floor Facing South (800x600).jpg Starting unbolting the shear wall panels at Elev. 1,2,3 Facing West (800x600).jpg Closing wall forms at L 3.3-5 and M 5-6 Facing North-East -2 (800x600).jpg Compacting at H-5 Footing Facing North (800x600).jpg Site fence down at Rahway Ave Facing South (800x600).jpg
Previous page Site fence down at Rahway Ave Facing South (800x600)
Site fence down at Rahway Ave Facing South (800x600)